Bathroom Shower Remodel #1


How It Was Done
-
Niche was designed with rough framing dimensions that account for waterproofing and tile layers
-
Half wall was built and all walls were waterproofed with Schluter Kerdi board and fasteners
-
New showerhead and valves were put in
Overview
-
Subway tile shower
-
New toilet
-
Durable paint for walls and trim
-
Designer tile flooring


How It Was Done
-
Shower door was removed
-
Niche had to be carefully designed and framed according to the tile chosen, making it so less tile had to be cut to fit the niche
-
New showerhead and handle were installed to make these bathroom shower remodels really shine
-
Waterproofing was installed, with subway tiles placed over
-
New flooring was installed then trim was painted and carefully put into place
Overview
-
Niche was framed and installed
-
Subway tile for shower wall was installed
-
New flooring was installed
-
New trim was installed
-
Glass was installed (not pictured here)
see reviews on Facebook
READY TO GET STARTED?
Click Below or Call 877-724-2892 to
Schedule a Free Estimate Today!
About Timing
Schatz Construction
Our Philosophy
When we take a job, we don’t cut corners.
Our attention to detail and work ethic set us apart from many others.
We stand by our work.